I suggest you ...

Edit multiple service start/end dates at once

Here is the issue.

An opportunity has been created with multiple services; lots of different technicians or local crew etc. At some point after the opportunity has been created the timings change and each service needs to be changed to reflect this, this can also happen due to simply not knowing the final times at the point of quoting. At the moment you have to edit each individual service to change the dates. Often this can be incredibly time consuming.

It would be massively helpful if there was a way to change the dates on multiple services at once, either by changing the default dates on the group they are in or being able to select multiple services to then edit together.

157 votes
Vote
Sign in
(thinking…)
Sign in with: Facebook Google
Signed in as (Sign out)
You have left! (?) (thinking…)
Rob shared this idea  ·   ·  Flag idea as inappropriate…  ·  Admin →

18 comments

Sign in
(thinking…)
Sign in with: Facebook Google
Signed in as (Sign out)
Submitting...

Feedback and Knowledge Base