I suggest you ...

Rental window optimiser

Not sure if I am missing something here, but we get a lot of hires/projects that are ad hoc in nature vs. needing to be at a fixed time.
What we are trying to do is have Current be able to answer the question "when is the best time for this hire/activity to take place?" ie: solve for lowest cost, highest profit, product availability (eg: avoid subhires, use gear that's under utilised)
The MVP would simply be to find the optimal pick-up, delivery or hire window based on a resource's availability (eg: if you want a CDJ 2000, the first one available on that day is at 11AM) - if I want to override i can do a sub-hire or find an alternative product.

6 votes
Vote
Sign in
(thinking…)
Sign in with: facebook google
Signed in as (Sign out)
You have left! (?) (thinking…)
Paul Muller, ALV Productions shared this idea  ·   ·  Flag idea as inappropriate…  ·  Admin →

1 comment

Sign in
(thinking…)
Sign in with: facebook google
Signed in as (Sign out)
Submitting...

Feedback and Knowledge Base